|
||
|
|
|
Version 05.12.06.00.06, July 14, 2012 |
|
Issue #: |
Assignment Breakdown |
Change: |
E3366 |
Reason: |
The Assignment Breakdown Account Mass Processing has been created on the web. This will update all accounts on Assignment Breakdowns that pass the selection parameters. This is similar to the Mass Change Dimensions on the Account Mass Processing but for Assignment Breakdowns. |
Menu: |
Approved Enhancement |
Implementation Note: |
Human Resources\Employee Administration\SN\PS\UT\BA |
Version 04.11.10.00.06, November 30, 2011 NSR |
|
Feature: |
Assignment Breakdown Record Add\Edit Screen (Warnings button) |
Issue #: |
241955 |
Change: |
The Assignment Breakdown Record Add\Edit screen was updated to reflect the S-275 Edits effective for 2011-2012. The Validation Warnings on the Assignment Breakdown Record Add\Edit screen represent only a partial replication of the numerous edits performed by the S-275 Report process and are not directly integrated with the actual S-275 Edit Journal, S-275 Personnel Report, or the S-275 extract file. The synchronization of these Validation Warnings with the actual SPI S-275 Edit Journal validations was inadvertently omitted from the S-275 annual updates released in the November 17, 2011 NSR. |
Reason: |
Defect correction. |
Menu: |
HR\SN\AS |
Version 04.10.12.01.05, April 9, 2011 |
|
Feature: |
WESPaC Breakdown Mass Change Utility |
Issue #: |
234737 |
Change: |
The Breakdown Mass Change Utility was modified to accept the selection of a building when the ‘Short Description’ and ‘Description’ for the building are not the same. Previously, after selecting a building as a parameter on the ‘Breakdowns Mass Change’ screen in the Breakdown Mass Change Utility, the selection was not saved to the ‘Selection of Breakdown Information to Change’ screen if the 'Short Description' and the 'Description' for the building did not match. Therefore, the building could not be used as a parameter when running this utility. |
Reason: |
Defect correction. |
Menu: |
HR\SN\WS\PU\BM |
Version 04.10.12.00.04, February 5, 2011 |
|
Feature: |
WESPaC Breakdown Mass Change Utility |
Issue #: |
226393 |
Change: |
The Breakdown Mass Change utility was modified to update the breakdown records appropriately when the ‘Mass change option’ is ‘0 = Equal to old code’ and the old code is <blank>. Previously, the utility did not update the breakdown records when these parameters were selected. |
Reason: |
Defect correction. |
Menu: |
HR\SN\WS\PU\BM |
Version 04.10.12.00.04, February 5, 2011 |
|
Feature: |
WESPaC Assignment Breakdown (Building Selection) |
Issue #: |
227305 |
Change: |
The Assignment Breakdown Record Add\Edit Screen was modified to eliminate an error that occurred if the ‘Short Description’ and ‘Description’ for the selected building did not match. |
Reason: |
Defect correction. |
Menu: |
HR\SN\AS |
Version 04.10.12.00.02, January 8, 2011 |
|
Feature: |
WESPaC Assignment Breakdown Record Add\Edit Screen (Warnings button – Grade Group “F”) |
Issue #: |
232823 |
Change: |
The ‘Warnings’ button on the Assignment Breakdown Record Add\Edit Screen was modified to include appropriate validation for the new Grade Group of “F” (4th Grade). Previously, the ‘Warnings’ button was enabled and the ‘Incorrect Grade group for assignment’ warning was generated even if Grade Group “F” was valid for the assignment. |
Reason: |
Defect correction. |
Menu: |
HR\SN\AS |
Version 04.09.06.01.01, November 7, 2009 |
|
Feature: |
Assignment Breakdown Report (Breakdown Code Type Parameters) |
Issue #: |
212634 |
Change: |
The Assignment Breakdown Report was modified so selection of specific Breakdown Code Types appropriately limits the main assignments and assignment breakdown records included on the report to only those matching the selected criteria. Previously, when specific Breakdown Code Types were selected, main assignments would appear on the report even if they had no breakdown records matching the breakdown selection criteria. Also, all breakdown records for each selected assignment would appear on the report instead of only those matching the selected breakdown criteria. |
Reason: |
Defect correction. |
Menu: |
HR\SN\WS\PU\AB |
Version 04.09.02.01.00, July 11, 2009 |
|
Feature: |
Assignment Breakdown |
Issue #: |
212016 |
Change: |
Building code data that was temporarily stored in the HPMBRK-ASN-BRKDWN.WA-MISC-CHAR field was erased since WSIPC code was modified to use the new building code field of HPMBRK-ASN-BRKDWN.HAABLD-BLD-CODE. Data stored in the temporary field was moved to the new field in the June 6, 2009 Release. |
Reason: |
Approved enhancement. |
Menu: |
HR\SN\AS |
Implementation Notes: |
It is important to identify any custom reports and interfaces that are currently using the HPMBRK-ASN-BRKDWN.WA-MISC-CHAR field and modify them so that they use the new HPMBRK-ASN-BRKDWN.HAABLD-BLD-CODE field as the data stored in the HPMBRK-ASN-BRKDWN.WA-MISC-CHAR field was removed. |
Version 04.09.02.01.00, June 6, 2009 |
|
Feature: |
Assignment Breakdown |
Issue #: |
212016 |
Change: |
WA Feature Set code associated with Assignment Breakdowns was modified to use the new building code field, HPMBRK-ASN-BRKDWN.HAABLD-BLD-CODE, rather than HPMBRK-ASN-BRKDWN.WA-MISC-CHAR. Building code data that currently resides in the HPMBRK-ASN-BRKDWN.WA-MISC-CHAR field is also being copied to the new HPMBRK-ASN-BRKDWN.HAABLD-BLD-CODE. |
Reason: |
Approved enhancement. |
Menu: |
HR\SN\AS and HR\SN\WS\PU (multiple utilities and reports) |
Implementation Notes: |
It is important to identify any custom reports and interfaces that are currently using the HPMBRK-ASN-BRKDWN.WA-MISC-CHAR field and modify them so that they use the new HPMBRK-ASN-BRKDWN.HAABLD-BLD-CODE field. In the July 2009 SR, WSIPC intends to remove the residual data stored in the HPMBRK-ASN-BRKDWN.WA-MISC-CHAR to prevent the accidental use of old data. |
Version 03.07.10.01.04, August 16, 2008 |
|
Feature: |
Assignment Breakdown Add\Edit Screen |
Issue #: |
207561 |
Change: |
Correct logic for Warnings messages |
Reason: |
Warning messages were being triggered for valid budgeting duty codes 001-005. |
Menu: |
HR\PR\PO\Assignment Breakdown button\View, Add or Edit HR\EM\AS\Assignment Breakdown button\View, Add or Edit HR\SN\AS\Assignment Breakdown button\View, Add or Edit |
Version 03.07.10.01.04, July 12, 2008 |
|
Assignment Breakdown |
Assignment Breakdown Add\Edit Screen |
Change: |
|
Reason: |
Planned functionality for Position & Assignment Restructure Project. |
Menu: |
HR\PR\Position tab\Edit (Assignments)\Assignment Breakdown button\Add or Edit HR\EM\Assignments tab\Edit\Assignment Breakdown button\Add or Edit HR\SN\Assignments tab\Edit\Assignment Breakdown button\Add or Edit |
Implementation Notes: |
Data conditions edited for:
|
Notes: |
|
Version 03.07.10.01.04, May 10, 2008 |
|
Feature: |
Clone Assignment Breakdown Record |
Change: |
Fix View-Only bug |
Reason: |
Defect in initial release (April SR): Cloning a Breakdown record caused subsequent Breakdown and Assignment record accesses to be View Only |
Menu: |
HR\SN\Assignments (tab)\Edit\Assignment Breakdown (button)\Clone (button) |